BOMBARDIER CHALLENGER 604 2001
Informações Gerais
-7151 horas totais
-Programa de motores GE OnPoint
-Programa de APU MSP Gold
-APU -150 Upgrade
-Programa de célula SmartParts Plus
-Collins ProLine Fusion Upgrade
– ATN-CPDLC-LINK 2000, FANS 1/A – Over Iridium
-Autothrottle Enhancement STC
-Interior para 12 passageiros feito em 2021
-Aircell ATG-4000 Hi-Speed Internet
-Pintura feita em 2021
-Inspeções de 24 / 36 / 48 / 96 meses feitas em março de 2025
-Sistema de rastreamento de manutenção CAMP
-Sem histórico de incidentes
Célula
TSN: 7151.6
CSN: 3,573
CAMP Maintenance Tracking Program.
Smart Parts Plus Airframe Program.
Motores e APU
General Electric GE CF34-3B (2)
Engines Enrolled on GE OnPoint Engine Program
Engine Fan Blade AD/SB Compliant.
Engine #1 (LH) Engine #2 (RH)
P/N: 6089T11G01 6089T11G01
S/N: 873021 873020
TSN: 7151.6 7151.6
CSN: 1285 1285
On Condition Maintenance Schedule
APU
Honeywell GTCP36-150(CL)
P/N: 3800804-1
S/N: P-719
-150 upgrade
APU Enrolled on Honeywell MSP Gold
Aviônicos e Rádios
- AIR DATA COMPUTERS: Dual Collins ADC-850E
- COCKPIT VOICE RECORDER: A-100S CVR
- COMMUNICATIONS: Dual Collins VHF-422C 8.33 VHF Comm
- DISTANCE MEASURING EQUIPMENT: Dual Collins DME-442 DME Transceiver
- FLIGHT DATA RECORDER: F1000 FDR
- FLIGHT MANAGEMENT SYSTEM: Triple Collins FMC-6000 Flight Management Computer
- GLOBAL POSITIONING SYSTEM: Dual Collins GPS-4000S Global Positioning System w/ SBAS
- HIGH FREQUENCY TRANSCEIVER: Dual Collins HF-9031A Transceivers
- INERTIAL REFERENCE SYSTEM: Triple Litton LTN-101 Inertial Reference Units
- NAVIGATION: Dual Collins VIR-432 Navigation Receiver
- TERRAIN AWARENES SYSTEM: Honeywell Mark V EGPWS
- TRAFFIC COLLISION ALERT AVOIDANCE SYSTEM: Collins TTR-2100 TCAS II Processor w/ Ch. 7.1
- TRANSPONDERS: Dual Collins TDR-94D Mode S
- WEATHER RADAR: Collins RTA-4114 MultiScan Weather Radar
- XM GRAPHICAL WEATHER
Equipamentos Adicionais
- ATN-CPDLC-LINK 2000
- FANS 1/A-Over Iridium
- Precision Plus Upgrade Installed (SB604-34-031)
- Auto Throttle Enhancement STC STO4357CH
- Gross Weight Increase Mod – 48,200 Lbs. MTOW (SB 604-11-001)
- ICG 200 Dual Channel for Datalink Arinc Datalink
- One (1) Therapeutic Oxygen Outlets & Masks
- (2)Cockpit EROS Oxygen Masks
- (1)Portable Oxygen bottle and mask
- Aircell ATG-4000 Hi-Speed Internet
- Honeywell Aspire 400 High Speed Internet and Phone Service
- CNX-200 Router Rockwell Collins Airshow 4000
- (2) 1080p Monitors, 1 Forward & 1 Aft 24 ” Flight Display Systems LCD Cabin Monitors
- 1 Flight Display DVD, CD, AUX in, Rear AUX, Front RCA
- 1 Flight Display Systems Blue Ray Player
- (13) 115V AC/60 HZ Outlets
- (2 in Cockpit, 2 in the Galley, 7 in Cabin, 1 in Lavatory ,1 AFT Baggage Compartment)
Modificações
- Forward Mounted Tronair Axle Jack, Bar & Storage Box
- Dual Ten (10) Person Life Rafts w/ 406 ELT
- 10 Gallon Water System
- External Fuel Panel and 2nd Cockpit controlled Refuel/DeFuel Panel
- Precise Flight Pulselite Landing System
- Rosen Cockpit Sun Visors/Rail System
- Metric Altitude Switch / Flashing Barometer Display
- Access Door Annunciator
- Tow Bar Mounted in AFT Equipment Compartment
- AFT Equipment bay (1)spare Main Wheel Storage and (2) spare Nose wheel storage
- Maintenance Ladder Mount (AFT Equipment)
- Common Keyed Medco Locks
- 2nd Radar Controller
- Remote Cabin Temperature Control
- Cabin Bus Disconnect Switch
- Passenger Oxygen System
Luzes Internas e Externas
Stair mounted and internal Boarding Light Switch
(2)Cockpit Map Lights
Avionics Bay Light, Aft Equipment Bay Light, Bay Door Steps
Upper Pylon (LOGO LIGHTS)
Exterior
Completed in 2021
Matterhorn White with Cobalt blue stripes and Titanium outlines
Interior
Completed in 2021
12 Passenger configuration with
Qty 4 FWD large single seats
AFT RH 4 place divan
AFT LH 4 place conference group
3 Crew including 2 Pilot (1) additional crew member jump seat
Status de Inspeções
12 Month Check – c/w April 2026 | Next Due Mar. 2027
24 Month Check – c/w March 2025 | Next Due Feb. 2027
36 Month Check – c/w March 2025 | Next Due Dec. 2027
48 Month Check – c/w March 2025 | Next Due Feb. 2029
96 Month Check – c/w March 2025 | Next Due Feb. 2033






